Project: The project consists of three 12 m diameter, 1'100 m long diversion tunnels, a Concrete Faced Rockfill Dam (CFRD) with a height above foundation equal to 131.00 m, volume of 23'700'000 m3, a surface Powerhouse with 6 vertical axis Francis units of 204 MW/unit equal to a total of approximately 1'200 MW installed rated capacity, a front inlet controlled spillway with 6 gates providing a discharge capacity of 15'288 m3/s, a mass concrete dam of height equal 51.50 m and concrete volume equal to 212'064 m3, an inclined power intake with three 11 m diameter tunnels with a total length of approximately 500 m and external 380 kV and 154 kV Switchyards.
Duration: 2 years
Education: Degree in Civil Engineering.
Experience: - At least 15 years of experience in Civil Engineering; - Experience in the supervision of major hydroelectric power projects; - Experience in the technical review, checking and approval of execution drawings and design reports related to all structures and in particular the Powerhouse, as well as on site administrative duties typically provided by a CRE (lead meetings, preparation of MoMs, organise a small design team on site, etc.). The CRE shall also ensure the good liaison between the head and on site offices and act as the companies representative; - Knowledge of Turkish an asset.
Working language: English
Contact information: Interested in this project? Please send your CV by email: cv@pmo.be, with the reference 147/640/001B/PMO in subject.
Post a Comment